BILLS-119hr1047rfs.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (8)
2025
180 days
1ST SESSION H. R. 1047
September 18
SEPTEMBER 19
later than 60 days
later than 90 days
every 5 years
EVENT (2)
the ‘‘GRID Power Act
the ‘‘Guaranteeing
GPE (2)
the United States of America
THE UNITED STATES
ORG (15)
Commission
the Federal Power Act
SEC
U.S.C.
the Federal Energy Regulatory Commission
Senate
the Interconnection of Dispatchable Power
Federal Power
the Committee on Energy and Natural
Resources
Congress
House of Representa-
Independent System Operator
the House of Representatives
PERSON (1)
KEVIN F. MCCUMBER
Topic Classifications
congressional legislation
99.0%
government oversight
60.9%
public health
37.7%
Extracted Keywords
grid
interconnection
bulk power
transmission
power act
adequacy
reliability
federal power
bulk
electric
power
proposal
rfs ssavage
prioritization
bills rfs
Forensic Analysis
PDF Metadata
- Creator
- U.S. Gov. Printing Office -- G.S.D.D.
- ModDate
- D:20250923000126-04'00'
- Producer
- Acrobat Distiller 25.0 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20250920015326-04'00'
Sentiment
Polarity
Positive
0.140
Subjectivity
45%
Objective
No crisis correlations found for this document.
The ML pipeline may still be processing.