BILLS-118hr7786ih.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (6)
7786
180 days
later than 90 days
2024
MARCH 21, 2024
1969
EVENT (2)
the ‘‘SPEED and Reliability Act
SESSION
H. R. 7786
FAC (9)
PO 00000
Frm 00008
Fmt
PO 00000
Frm 00007
PO 00000
Frm
PO 00000
Frm 00010
PO 00000
Frm 00009
PO 00000
Frm 00011
Fmt
PO 00000
Frm 00006
PO 00000
Frm 00001
PO 00000
Frm 00004
GPE (2)
States
the United States of America
NORP (1)
Indian
ORG (21)
State
Commission
U.S.C.
Federal Power
Senate
THE HOUSE OF REPRESENTATIVES
Electric Demand and Reliability
linear
Federal
the Federal Energy Regulatory
Commission
Congress
House of Representa-
a)(4
the
Committee on Energy and Commerce
the Federal
Energy Regulatory Commission
the National Environmental Policy Act
the Infrastructure Investment
Continental Shelf’
SEC
Continental Shelf
PERSON (1)
PETERS
Topic Classifications
congressional legislation
96.9%
government oversight
37.0%
public health
17.3%
Extracted Keywords
transmission
reliability
federal power
shelf
outer
power act
facil ity
facil
impact
electric
facility
continental shelf
outer continental
high
proposed
Forensic Analysis
PDF Metadata
- Creator
- U.S. Gov. Printing Office -- G.S.D.D.
- ModDate
- D:20240411111938Z
- Producer
- Acrobat Distiller 23.0 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20240411063256-04'00'
Sentiment
Polarity
Neutral
-0.002
Subjectivity
34%
Objective
No crisis correlations found for this document.
The ML pipeline may still be processing.