BILLS-118hr5551ih.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (24)
22:43 Sep 19
5551 IH
5-year
later than 2 years
present-day
1 year
every 5 years
2014
20
year
14
year
1ST SESSION H. R. 5551
2018
2023
later than 18 months
2020
2022
2019
later than 180 days
2021
the last 1⁄10 of the
2035
SEPTEMBER 18
December 31
recent decades
EVENT (1)
the ‘‘Building Integrated
GPE (6)
the United States
Texas
the United States of America
China
United States
California
LOC (5)
North America
South America
Europe
East Coast
Midwest
ORG (19)
Commission
SEC
ERCOT
the Federal Energy Regulatory Commission
the Energy Information Administration
Senate
the
Committee on Energy and Commerce
House of Representa-
Congress
the Energy Information Administra-
Inter-Regional Energy
the Department of Energy
ELECTRIC RELIABILITY COUNCIL OF TEXAS
1⁄3
4
Commission
Form EIA–930
THE HOUSE OF REPRESENTATIVES
U.S.C. 824 et
PERSON (1)
PETERS
Topic Classifications
congressional legislation
87.9%
government oversight
13.4%
Extracted Keywords
interregional
transmission
grid
capability
transfer
electric
weather events
regulatory commission
extreme weather
minimum
electrical
region
planning
extreme
electric grid
Forensic Analysis
PDF Metadata
- Creator
- U.S. Gov. Printing Office -- G.S.D.D.
- ModDate
- D:20230921031526Z
- Producer
- Acrobat Distiller 23.0 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20230920224613-04'00'
Sentiment
Polarity
Neutral
0.072
Subjectivity
51%
Subjective
No crisis correlations found for this document.
The ML pipeline may still be processing.