BILLS-107hr2585ih.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (3)
later than 1 year
JULY 20, 2001
2001
EVENT (1)
SESSION
H.
FAC (2)
the Chiloquin Dam
the Chiloquin Dam
8
GPE (3)
Oregon
Washington
the United States of America
LOC (1)
the Sprague River
ORG (11)
Interior
THE HOUSE OF REPRESENTATIVES
Congress
House of Representa-
the Modoc Point Irrigation District
the Oregon Department of Fish and Wildlife
Passage Feasibility Study Act
the Committee on Resources
SEC
Senate
PERSON (9)
HOOLEY
SIMP-
POMBO
DEFAZIO
HASTINGS
CALVERT
HANSEN
WALDEN
GIBBONS
Topic Classifications
congressional legislation
98.3%
government oversight
72.2%
public health
49.1%
Extracted Keywords
passage
dam
downstream
fish
feasibility
oregon
conduct study
feasibility study
interior conduct
study
adequate
river
providing
authorize secretary
secretary interior
Forensic Analysis
PDF Metadata
- ModDate
- D:20230115235627Z
- Producer
- Acrobat Distiller 4.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20011029201314Z
Sentiment
Polarity
Positive
0.165
Subjectivity
38%
Objective