BILLS-105hr4111rh.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (7)
OCTOBER 12, 1998
March, 1998
14–06–859–308
June 23, 1998
later than 1 year
later than 6 months
EVENT (1)
SESSION
H. R. 4111
FAC (7)
the Auburn Dam
Folsom Dam
the Auburn-Folsom South Unit
the Auburn
Dam
FOLSOM
the Folsom Dam and Reservoir
GPE (9)
the United States
California
fornia
Alaska
United States
the State of California
Folsom
the United States of America
Sacramento
LOC (2)
American River
Central Valley Project
NORP (2)
Northfork American
ORG (26)
SEC
the State of California
CONGRESS
the State of the Union
the Whole House
THE HOUSE OF REPRESENTATIVES
IB
Union Calendar No.
Flood Control Agency
Northfork
the Committee of the Whole
House
the State of Califor-
Interior
Placer
House of Representa-
Georgetown Divide Public Utility
the Army Corps of Engineers’
Project
County Water Agency
Reservoir
the Placer County Water Agency
the Bureau of Reclamation
Auburn
Folsom Dam
Senate
APPROPRIATIONS
PERSON (6)
POMBO
Cofferdam
HERGER
DOOLITTLE
Stepped
YOUNG
Topic Classifications
congressional legislation
99.3%
government oversight
80.6%
financial regulation
38.9%
Extracted Keywords
folsom
folsom dam
american river
dam
share cost
state california
shall percent
project
flood control
modifications
federal share
river
flood
reconstruction
authorized section
Forensic Analysis
PDF Metadata
- ModDate
- D:20230117130113Z
- Producer
- Acrobat Distiller 2.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:19981013071348Z
Sentiment
Polarity
Neutral
0.067
Subjectivity
34%
Objective