BILLS-105hr4111ih.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (7)
14–06–859–308
1998
JUNE 23, 1998
later than 6 months
the 1 year
later than 1 year
March
EVENT (3)
SESSION
H. R. 4111
‘‘March 1996
IH
Modification Report
FAC (7)
FOLSOM DAM
the Auburn
Dam
FOLSOM
the Auburn-Folsom South
the Folsom Dam and Reservoir
the Auburn Dam
GPE (10)
the United States
California
the State of California
the United States of America
Folsom
Sacramento
Alaska
United States
the State of
fornia
LOC (1)
American River
NORP (2)
Northfork American
ORG (20)
SEC
the Auburn Project
Reservoir
the Placer County Water Agency
Congress
Interior
the Bureau of Reclama-
Senate
Auburn
APPROPRIATIONS
Placer County Water Agency
the Army Corps of Engineers’
Georgetown Divide Public
Auburn Project
Area Flood Control Agency
Folsom Dam
Central Valley Project
THE HOUSE OF REPRESENTATIVES
House of Representa-
PERSON (5)
HERGER
DOOLITTLE
Stepped
POMBO
YOUNG
Topic Classifications
congressional legislation
97.3%
government oversight
51.5%
financial regulation
16.5%
Extracted Keywords
folsom
folsom dam
american river
dam
state california
share cost
project
shall percent
modifications
federal share
river
reconstruction
flood control
authorized section
project shall
Forensic Analysis
PDF Metadata
- ModDate
- D:20230117154632Z
- Producer
- Acrobat Distiller 2.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:19980624025139Z
Sentiment
Polarity
Neutral
0.041
Subjectivity
36%
Objective