BILLS-105hr4079rh.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (3)
SEPTEMBER 15, 1998
JUNE 18, 1998
October 1997
EVENT (1)
SESSION
H. R. 4079
FAC (2)
Folsom Dam
Folsom Reservoir
GPE (2)
California
the United States of America
LOC (2)
the American River
Valley Project
ORG (14)
Committed to the Committee of the Whole House
Interior
CONGRESS
non-Federal
Senate
the
Committee on Resources
THE HOUSE OF REPRESENTATIVES
the Central Valley Supply
TCD
FOLSOM
House of Representa-
the State of the Union
IB
Union Calendar No
PERSON (1)
DOOLITTLE
Topic Classifications
congressional legislation
98.3%
government oversight
72.4%
public health
21.1%
Extracted Keywords
temperature
temperature control
folsom
construction temperature
folsom dam
associated temperature
temperature monitoring
control device
dam
device
devices
monitoring
valley
steelhead
american river
Forensic Analysis
Classification Stamps
DRAFT
PDF Metadata
- ModDate
- D:20230117135425Z
- Producer
- Acrobat Distiller 2.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:19980916052207Z
Sentiment
Polarity
Neutral
0.060
Subjectivity
46%
Objective