BILLS-105hr4079rfs.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (4)
September 15
SEPTEMBER 16, 1998
October 1997
1998
EVENT (1)
SESSION
H. R. 4079
FAC (2)
Folsom Dam
Folsom Reservoir
GPE (3)
California
THE UNITED STATES
the United States of America
LOC (2)
the American River
Valley Project
ORG (13)
non-Federal
Senate
the House of Representatives
the Central Valley Supply
TCD
Congress
FOLSOM
Interior
House of Representa-
IIA
the Committee on Energy and Natural
Resources
PERSON (1)
ROBIN H. CARLE
Topic Classifications
congressional legislation
98.6%
government oversight
86.3%
public health
33.6%
Extracted Keywords
temperature
temperature control
associated temperature
folsom
folsom dam
temperature monitoring
construction temperature
control device
device
dam
monitoring
valley
steelhead
american river
federal facilities
Forensic Analysis
Classification Stamps
DRAFT
PDF Metadata
- ModDate
- D:20230117135448Z
- Producer
- Acrobat Distiller 2.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:19980917024311Z
Sentiment
Polarity
Neutral
0.048
Subjectivity
49%
Objective