BILLS-105hr3698ih.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (3)
later than 2 years
March 1996
APRIL 21, 1998
EVENT (1)
SESSION
H. R. 3698
FAC (3)
the Folsom Dam
FOLSOM DAM
Howe Avenue
GPE (2)
California
the United States of America
LOC (2)
the American River Watershed
ican River Watershed Investigation
NORP (1)
American
ORG (17)
SEC
Congress
Senate
Folsom
Federal
CALI-
the Union Pacific Railroad
REPORT.—If
non-Federal
Interior
House of Representa-
Army
Dam and Reservoir
the Committee on Transportation
the Sacramento River Flood Control Project
THE HOUSE OF REPRESENTATIVES
PERSON (3)
HOWE AVENUE BRIDGE PROJECT
MATSUI
FAZIO
Topic Classifications
congressional legislation
93.3%
government oversight
71.7%
financial regulation
18.3%
Extracted Keywords
folsom
folsom dam
bridge
chief engineers
dam
federal share
avenue
river
american river
watershed
share cost
feet
railroad
engineers
projects authorized
Forensic Analysis
PDF Metadata
- ModDate
- D:20230117170940Z
- Producer
- Acrobat Distiller 2.0 for Windows; modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:19980422060512Z
Sentiment
Polarity
Neutral
0.054
Subjectivity
38%
Objective