BILLS-113hr267enr.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (15)
later than 60 days
1978
2013
2-year
Thursday
later than 240 days
the next 13 years
later than 180 days
2025
later than 15 days
later than 1 year
3
years
the third day of January, two thousand and thirteen
later than 45 days
later than 3 years
EVENT (2)
the ‘‘Hydropower
Regulatory Efficiency Act
the ‘‘Commission
GPE (5)
the United States
United States of America
the City of
Washington
the United States of America
ORG (26)
SEC
Commission
Senate
U.S.C.
the House of Representatives
the Federal Power Act
Congress
the Committee on Energy and Commerce
House of Representatives
the Committee on Energy and Natural Resources
the Public Utility Regulatory Policies Act
State
Federal or State
Committee
the Federal Energy
UNDERSTANDING.—The Commission
the Committee on Energy
Energy and Natural Resources
Natural Resources
Energy and Commerce
FERC AUTHORITY
Hydro-
FERC
Energy
Commerce
PERSON (4)
H. R. 267—4
H. R. 267—5
H. R. 267—3
H. R. 267—2
Topic Classifications
congressional legislation
96.4%
government oversight
28.6%
civil rights
13.0%
Extracted Keywords
hydropower
pumped
conduit
conduit hydropower
facility meets
qualifying criteria
dams
sec promoting
pilot projects
qualifying
storage
generation
projects
pilot
describes
Forensic Analysis
Classification Stamps
EXEMPT x3
PDF Metadata
- Creator
- ACOMP.exe WinVer 2.0 Nov 24 2008
- ModDate
- D:20230107090344Z
- Producer
- Acrobat Distiller 11.0 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20130802093614-04'00'
Sentiment
Polarity
Neutral
-0.016
Subjectivity
46%
Objective