BILLS-113hr267eh.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (18)
2-year
2013
later than 60 days
1978
the 3 years
15
year
later than 180 days
later than 1 year
2025
later than 45 days
12
year
February 13
13
year
later than 15 days
EH
year
later than 240 days
the next 13 years
later than 3 years
EVENT (2)
SESSION
H.
the ‘‘Commission
GPE (3)
the United States
United States
the United States of America
ORG (26)
Commission
SEC
Congress
Senate
the Committee on Energy and Commerce
U.S.C.
the Committee on Energy
the House of Representatives
PILOTS.—The Commission
House of Representa-
Natural Resources
Committee
State
the Hydropower Regulatory Efficiency Act
FERC AUTHORITY
the Federal Power Act
United
House of Representatives
MIT PERIODS
FERC
Federal
the Federal Energy Regulatory Commission
Energy
Energy and Natural Resources
Topic Classifications
congressional legislation
97.3%
government oversight
19.1%
public health
10.4%
Extracted Keywords
hydropower
qualifying criteria
facility meets
conduit
conduit hydropower
qualifying
sec promoting
pumped
dams
facility shall
facility
criteria
electricity
promoting
generation
Forensic Analysis
Classification Stamps
EXEMPT
PDF Metadata
- Creator
- ACOMP.exe WinVer 2.0 Nov 24 2008
- ModDate
- D:20230107154219Z
- Producer
- Acrobat Distiller 9.5.3 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20130213142206-05'00'
Sentiment
Polarity
Neutral
-0.030
Subjectivity
47%
Objective