BILLS-113hr251enr.pdf
House Resolutions
0 pages
Page
of 0
Loading OCR text...
No OCR text available for this page.
Failed to load OCR text.
DATE (7)
April 7, 1986
1 year
Thursday
1969
1973
the third day of January, two thousand and thirteen
later than 30 days
EVENT (1)
the ‘‘South Utah Valley Electric
FAC (3)
the Strawberry Substation
Strawberry Valley Project
Strawberry
Valley Project
GPE (7)
the United States
United States of America
Strawberry Valley
Washington
the City of
the United States of America
South Utah
NORP (1)
Poles
ORG (17)
SEC
Interior
Senate
Congress
the Electric Distribution System
U.S.C.
the Strawberry Valley Project
House of Representatives
Electric Service District
Valley Electric Service District
non-Bureau of Reclamation
Shared
Power
the House of Representatives
Electric
Distribution Fixtures
the Electric Distribution
System
the National Environmental Policy Act
the State of Utah
PERSON (3)
H. R.
H. R. 251—2
H. R. 251
Topic Classifications
congressional legislation
92.6%
government oversight
21.8%
Extracted Keywords
strawberry
electric distribution
fixtures
power poles
poles
valley project
electric
valley
shared
interests lands
irrigation
lands interests
power
distribution
lands
Forensic Analysis
PDF Metadata
- Creator
- ACOMP.exe WinVer 2.0 Nov 24 2008
- ModDate
- D:20230107094726Z
- Producer
- Acrobat Distiller 11.0 (Windows); modified using iText® Core 7.2.3 (production version) ©2000-2022 iText Group NV, Government Publishing Office
- CreationDate
- D:20130711094542-04'00'
Sentiment
Polarity
Neutral
-0.006
Subjectivity
49%
Objective